Infrastructure · In Development · Patent Filing Q2 2026
The Visa network
for energy transactions.
Automated clearing and settlement for every distributed energy flexibility transaction. Multi-party, multi-market, real-time. Built in Rust for compile-time safety. Cryptographically auditable. Seven-day payment versus industry-standard sixty to ninety days.
7 day
Payment cycle vs 60-90 industry standard
Rust
Compile-time safety. Zero runtime failures.
3+
Market jurisdictions designed (UK, EU, US)
SHA256
Cryptographic hash-chain audit trail
The problem
Settlement in distributed energy
is broken.
Visa processes 65,000 transactions per second.
Energy flexibility settlement runs on spreadsheets.
01
Manual logging
Aggregator logs dispatch in a spreadsheet.
→
02
Weeks to verify
Grid operator verifies delivery against metering data.
→
03
Bilateral invoicing
Manual invoice between each counterparty pair.
→
04
60-90 day payment
Asset owner finally receives payment months later.
The solution
Four pillars of
AmpVerve Settle.
Rust execution engine
Memory-safe, zero runtime failures, formally verifiable. No other energy platform is built in Rust.
Cryptographic audit trail
SHA-256 hash-chain. Tamper-evident. Regulator-ready. Not blockchain. Better than blockchain.
Multi-market rules engine
UK: FFR, DC, CM, BM, DNO flex. EU: FCR, aFRR, mFRR. US: FERC 2222. One clearing cycle.
Seven-day payment
Automated reconciliation. 7 days, not 90. Faster cash flow unlocks smaller participants.
Who needs this
Every participant needs
settlement infrastructure.
Segment
Why they need Settle
What they use today
Grid operators
Verify and pay for flex dispatches
Spreadsheets
Aggregators
Multi-market settlement for thousands of assets
Bilateral invoicing
Utilities
DER services for millions of customers
Elexon (wholesale only)
Auto OEMs
V2G revenue for vehicle owners
Chargescape (US only)
Regulators
Market surveillance and compliance
Self-reporting
Intellectual property
Patent-protected
settlement architecture.
Three UK patent applications covering automated multi-party settlement, cryptographic verification, and multi-market dispatch. PCT international filing within 12 months.
3
UK patent applications (2 filed, 1 filing Q2 2026)
PCT
International filing covers US, EU, Australia, Japan
Get started
Settlement infrastructure for
distributed energy does not exist. Yet.
If you are a grid operator, aggregator, utility, or regulator interested in automated DER settlement.